I wrote about getting an off-plan unit ready for the market before the keys land in your hand. That piece covered the weeks before handover. This one picks up on handover day itself, because that's when the apartment you've been planning around for months finally becomes a physical object you can touch, test and complain about.
Snagging is the word for that complaint list. Done properly, on the right day, it costs you nothing but time. Skipped, it costs you a plumber call-out mid-stay and a guest review that mentions the smell in the bathroom. I'd rather you find the leak before the first booking does.
What snagging actually means
Snagging is the formal inspection of a newly handed-over unit to list every defect, finish issue and non-working item before you accept the keys as final. The word comes from construction, not hospitality, but it matters even more for a short-let apartment than for a home you'll live in yourself.
You get one clean shot at this. Once you sign the handover form and the defects liability period starts ticking, every fix becomes a negotiation instead of an obligation. The report you file on day one is the only leverage you have.
Inspect it yourself, or bring in a snagging company
Two options, both reasonable. Walking the unit yourself costs nothing and forces you to learn the apartment, which helps later when a guest calls about a switch you can't locate. A dedicated snagging company brings a trained eye, a moisture meter, and a habit of checking things owners forget, like the fall of a shower floor.
I tell owners to do both if they can: walk the unit yourself first with a slow, room by room checklist, then bring in a professional for the technical checks you can't do with your eyes alone, water pressure, insulation, electrical load. For a studio or one-bedroom, the self-inspection alone catches most of what matters.
What a self-inspection should cover
- Every door and window opens, closes and locks without forcing it
- Every socket, switch and breaker actually powers what it's labelled for
- Taps run hot and cold, drains empty fast, no standing water after a shower
- AC cools every room within a reasonable time, no odd smell on start-up
- Tiling sits flat, grout lines are even, no hollow sound when you tap a tile
- Paint finish is consistent, no patch marks from touch-up work
- Kitchen appliances power on and the extractor fan actually extracts
The defects that come back as guest complaints
Some snags are cosmetic and some become operational problems the moment a paying guest moves in. I prioritise the ones that turn into a 2am message from a guest.
Bathroom waterproofing tops the list. A seal that looks fine dry will leak within weeks of daily guest showers, and water finds the unit below before it finds you. Run every shower for a full cycle during the inspection, not a quick splash.
AC is next. Dubai summers run past 45°C, and a unit that cools eventually during a mild handover week will struggle in August. Test each zone, check the thermostat response time, and listen for a compressor that cycles too often.
Joinery, electrical and tiling round out the list: a wardrobe door that won't close ends up in the first review photo a guest takes of the room. A breaker that trips under normal load means a call-out during someone's stay. A loose tile near a doorway is a liability claim waiting to happen.
Photograph every defect with a timestamp and a close-up, and keep the originals. If a dispute drags past the defects liability period, dated photos are the only proof the issue existed before you accepted the unit, not after a guest caused it.
Raising the warranty claim with the developer
Most developers in Dubai run a structured snagging process: a joint inspection with their handover team, a report you both sign, and a window, often a few weeks, to re-inspect after remedial work. Read your sale and purchase agreement for the exact mechanism, it varies by developer and isn't standardised across the market.
Put everything in writing, even items the handover officer promises to note down. Email the list the same day, reference the unit number and handover date, and ask for a written acknowledgement. Verbal promises on a walk-through don't survive three months later when the person you spoke to has moved teams.
If the developer's fix doesn't hold, re-snag it. A repainted wall over a damp patch isn't a repair, it's a postponement. I've seen owners accept a cosmetic fix early on and discover the real issue during the busy season, right when cancelling bookings costs the most.
The defects liability period, and what happens after it closes
Most Dubai sale and purchase agreements include a defects liability period, commonly around one year from handover, during which the developer remains responsible for structural and major finishing defects. Confirm the exact length and scope in your own contract, terms differ by developer and project.
Once that period closes, the cost of any defect you missed sits with you. That's the real argument for a thorough inspection at handover rather than a quick walk-through: every week you wait is a week closer to a bill you can't send back.
Factor this timing into your launch plan. Snagging week is when you confirm the apartment can actually deliver on what your listings promise, not a formality to rush through before you publish.
Why a skipped defect becomes a one-star review
Guests don't file a warranty claim. They write a review. An AC that struggles, a bathroom that smells of damp, a door that sticks, these show up as not as described or needs maintenance in public text that sits on your listing for years.
Climbing from a 4.6 to a 4.9 rating is mostly about removing small frictions one by one. A defect caught at handover never becomes a friction point at all, it's one less thing your cleaning team has to flag and one less thing a guest has to mention.
It also protects your turnover standards. Our cleaning checklist catches wear and tear between stays, but it was never built to catch a defect that was there on day one. Snagging and turnover inspection are two different jobs, don't ask one to do the other's work.
Handover is the easy part. Operating it well is the job.
If you'd rather have someone else walk the apartment, log the snags and chase the developer, that's exactly where our team starts.
Talk to us